How to repair a hole in the floor of a slab foundation.
Patching concrete floor after rough plumbing.
This is part of a bathroom remodeling project.
During new construction the builder installs drain lines and stubs that will connect to future plumbing fixtures before he pours the slab on grade.
Many remodel projects in homes with a concrete foundation and slab call for moving plumbing fixtures such as toilets sinks and floor drains.
Vinyl concrete patcher is ideal for making smooth repairs to crack or chipped concrete floors sidewalks or steps.
Vinyl concrete patcher is quikrete 40 lb.
Just prior to the contractor ending work his plumbing and electrical subs had passed their rough inspections then his demo guy covered up the work in preparation for patching the slab.
The cooler the weather the longer the curing time.
The temperature of the existing concrete must remain above 50 degrees for the first 24 to 48 hours after the patch is applied.
Vinyl concrete patch repair quikrete 40 lb.
Wait at least 24 hours before walking on the patch and a week before driving on it.
For a texture pull a damp push broom over the concrete.
Well the contractor walked mid job so i ll be gc ing after all.
It has strong adhesive properties allowing it to be applied down to a featheredge.